ABT 9,450 MTDW TWEEN DECK GENERAL

ABT  9,450 MTDW TWEEN DECK GENERAL
CARGO VESSEL (BOX SHAPE HOLDS)
BUILT MARCH, 2006
AT NISHI SHIP BUILDING CO.,LTD
==============================
PANAMANIAN FLAG
CLASS : NK
LAST SS MARCH 04, 2011
NEXT SS MARCH 02, 2016
LAST DS MARCH 04, 2011
NEXT DS MARCH 03, 2014 TOBE CLEARED BY END OF FEB IE WITHIN
NEXT MONTH.
LOA  97.61M
LBP  89.95M
BM 18.80M
DM UPPER DECK  13.00M
DM 2ND DECK          7.30M
DRAFT (EXT.)          9.201M
TWO HOLDS
HOLD CAPACITY GRAIN 12,141M3
                          BALE  11,432M3
STRENGTH :
ON TANK TOP                        15.00 T/M
ON 2ND DECK                        4.07 T/M
ON UPPER DECK                    1.42 T/M
ON HATCH (2ND DECK)          3.50 T/M
ON HATCH (UPPER DECK)      1.42 T/M

CARGO HATCH SIZE  :
UPPER DECK NO.1            22.400  12.600M
UPPER DECK NO.2            23.100  12.600M
2ND DECK NO.1                22.400M12.600M
2ND DECK NO.2                23.100M12.600M
TYPE OF HATCH COVERS :
UPPER DECK SINGLE PULL TYPE STEEL HATCH COVER.
2ND DECK PONTOON TYPE STEEL HATCH COVER.
CARGO GEAR                  DECK CRANE  30T X 2
TWO DECK CRANES CAN BE COMBINED TO LIFT UPTO 60T
M/E : AKASAKA - MITSUBISHI UE 6UEC33LSII X 1 SET
MAXIMUM OUTPUT 3,400 KW (4,623PS)  X 215 RPM
NORMAL OUTPUT 2,890 KW (3,930 PS) X 204RPM (85PCT MCR)
RECENT SEA SPEED ABT 13.6 KNOTS ON FOC (VSL BURN BOTSH 180CST)
ABT 13MT/DAY (ABT 80PCT LOAD / 195RPM)
RECENT SLOW SPEED ABT 12.0 KNOTS OC FOC ABT 11MT/DAY (ABT 65-70 PCT
LOAD)
(ABOVE DETAILS ARE GUIDANCE PURPOSE ONLY AND NOT GUARANTEED)
PRICE : WE CAN GUIDE AGAINST NAMED BUYERS' SERIOUS ENQUIRY.
DELIVERY : WITHIN JAPAN / SINGAPORE RANGE WITHIN ABT 30-45 DAYS
                      AFTER DEPOSIT IS LODGED INTO JOINT ACCOUNT AT
THE
SELLERS'
                      NOMINATED BANK IN JAPAN.
VESSEL'S ITINERARY : TRADING BETWEEN JAPAN AND TAIWAN AND INSPECTION
WILL BE PERMITTED IN JAPAN / IN TAIWAN IN THE MEANTIME VSL IS
SCHEDULED TO ENTER DRYDOCK OF JAPANESE SHIPYARD AT WEST JAPAN
LATE FEBRUARY FOR THE PURPOSE OF NEXT DOCKING SURVEY DUE MARCH 03 OF
THIS YEAR WHERE INSPECTION WILL BE ALLOWED.

No comments:

Post a Comment